Water & Wastewater Engineering

Pula Consultants teamed up with African Consulting Engineers in the design of the Upgrading of Gaborone Sewerage Infrastructure and Sewerage Treatment works for the city of Gaborone, especially in the design of the reticulation part of the project. Pula Consultants has also carried out numerous sewer reticulations for most of the Building projects.

Pula Consultants has also been involved in the design and construction of improvements to the water supply installations in the Ramotswa Village and the interconnected villages of Tsetsebjwe, Molalatau, Mathathane and Motlhabaneng in the Bobonong Sub-District. 

UB Science and Health Building Project

In April 2006 Pula Consultants was commissioned by the University of Botswana to carry out the design and construction supervision of all the civil engineering works. The Civil works included, paved road works, parking areas, storm water drainage system, water and sewerage reticulation network. The project was successfully completed in June 2011.

Thune Dam, New Realigned Road

Pula Consultants as part of the Thune Dam Consultants Joint Venture carried out design Review and Documentation of NEW road alignment as part of Thune Dam project.

Goodhope Pipeline

The Department of Water Affairs is upgrading the water supply, storage and distribution systems at Goodhope Village and the Sub - District. The present water supply infrastructure and storage facilities are inadequate and are to be augmented to meet the projected 20-year design horizon (2029).The project has been divided into two phases with phase 1 being for design and construction of water transmission mains to service the Goodhope village but with a capacity to service the whole sub-district.

Molepolole NSC

Pula Consultants was responsible for the detailed design, contract and tender documentation, tendering and construction of the structural reservoirs, pump station and water reticulation from Mmamashia treatment works to Molepolole Village. The project construction has been suspended as this project has now to cater for Thamaga, Moshupa and Kanye villages in addition to Molepolole.

Upgrading of Gaborone Sewer Infrastructure and Treatment Plant

The commission to work on this project was granted to Pula Consultants in 2002. The scope of work comprised detailed design, tender documentation, construction supervision relating to the upgrading of existing internal reticulation and main truck sewers, and the provision of new main trunk sewers where necessary, new tertiary sewer reticulation in unserviced Self Help Housing Agency areas in Gaborone. The project was in joint venture with ACE Consultants.

Ramotswa Booster Pump Station 1 & 2

Pula Consultants provided the engineering design and completed the supervision consultancy services for the Ramotswa Booster Pump Station Project that included access roads to all reservoir sites and related water upgrading services.